Ready for the next trip.
Uses the available supply to charge without waiting for solar surplus. Grid electricity may be used.

FENNOR / EV CHARGING
Come home, plug in and charge around your routine. Fennor helps you plan a home charger around the car, driveway, electricity supply and any solar you already have.

THE DRIVEWAY IS PART OF THE ENERGY PLAN
A charger should work for the journey you need to make, even when the sun does not cooperate. Use this illustration to separate driving energy from available solar surplus.
Illustrative driving energy for 40 km.
3.0 kWh of that demand could be matched by the assumed surplus before charging losses.
Distance × consumption ÷ 100. This is an energy comparison, not a charging forecast. Charger and vehicle limits, minimum charging power, weather, losses and when the car is plugged in can reduce the usable contribution. Defaults are examples, not Irish driving averages.
ZAPPI / DIFFERENT CHARGING PRIORITIES
Uses the available supply to charge without waiting for solar surplus. Grid electricity may be used.
Adjusts charging around available surplus and may draw grid electricity to maintain charging.
Can pause when the configured surplus conditions are not met. Vehicle behaviour and settings affect the result.
This is a simplified overview. At handover, the installation team demonstrates charging modes, minimum-green settings, boosts and load management for your vehicle, so you can choose between waiting for surplus and being ready for a trip.
PLAN THE ORDINARY DETAILS
Fennor plans the charger position around where you park, the cable reach and your vehicle. We also account for a future car, so the proposed position works for the way you use your driveway.
A Registered Electrical Contractor assesses supply capacity, protection and load management alongside your home’s other loads. A charger’s maximum rating is not a promise that every vehicle or supply can use it.
Add EV charging to your home system ↗Tell us where you park, your usual journeys and whether you have solar. We explain the proposed charger, installation work and the support relevant to a private home or shared development.
Explore charger grant support ↗YOUR PROJECT WITH FENNOR
We explain the choices, the work involved and what happens next, so you can decide with a clearer picture.
myenergi zappi offers FAST, ECO and ECO+ modes, using grid power and available surplus differently. We relate those options to when you need the car ready. Solar is optional; compatible charging can use grid electricity when needed.
We start with parking, cable reach and the car’s arrival and departure times. The electrical assessment establishes supply and load-management requirements. The vehicle’s onboard charger and minimum charging needs also matter; solar cannot charge a car while it is away.
SEAI offers up to €300 for an eligible home charger. It requires an eligible smart charger and a Safe Electric Registered Electrical Contractor, with the offer in place before the relevant costs or work. We explain the application sequence alongside your installation plan.
A SIMPLE START
MORE WAYS WE CAN HELP
SUPPORT FOR THE WORK YOU HAVE IN MIND
These are the relevant funding options to discuss with Fennor alongside your project. We explain the full price, the support that may apply and the steps before you commit.
Reviewed · Guidance, not an eligibility decision.
Grant support
Up to €300
Separate support towards an eligible smart home charger and its installation—not towards the car or the solar panels.
Grant support
60%–90% of eligible infrastructure
Support for a qualifying shared-development charging network, plus €600 per charge point under SEAI’s infrastructure route. It is not an automatic top-up to every home-charger grant.
USEFUL ANSWERS
Plain language. No pressure to have it all figured out.
No. It can charge from the grid. We explain which solar-aware functions apply where compatible generation and measurement are present, or plan charging without solar.
It depends on mileage, vehicle efficiency, connection times and available surplus. We work through those patterns with you, including seasonal changes and grid charging when solar is not enough.
No. Property, equipment, contractor and application conditions apply. We explain what needs approval and when, so the required grant offer is in place before the relevant purchase or work.
LET’S TAKE THE NEXT STEP
Based in Slane, serving Meath, Louth and Dublin. Tell us about a project further afield and we will confirm whether we can help.
089 403 2737 ↗info@fennor.ieWe will confirm the next step, availability and any assessment cost with you before a visit is booked.